BY RAYMOND F. MESSER VICE PRESIDENT WALTER P. MOORE AND ASSOCIATES, INC. Owners and municipalities are becoming more a w a r e of the need for detailed inspection to insure safe and economical construction, particularly for de-sign-build or fast-track construction and for more so- phisticated stru c t u r al systems such as post-tensioned c … documentation, and electronically submitted to the MOOT Structural Fabrication Unit. 1.3 Is the excavation dry? 1. Name * Email * Postcode * Submit. See to it that spacers are provided to maintain the grade slab’s concrete cover to reinforcements. The checklists may not include every item that must be inspected to verify compliance with the applicable contract requirements. Pre-pour checklist for Concrete Placement. I . Manage your inspection template, documents and results in the cloud, where they are stored securely and always accessible. Instantly … Co n s t r uction loads for which the form w o r k is de signed, including permissible concentrated form l o a d s , if any 3. The size and shape of the slab accords with the relevant floor plan Checklist for RCC Slab and Beams. Construction Process 1. Review notes and changes on drawings that may affect construction process 2. Post concrete inspection involves both eye […] Ref. Post concrete inspection of concrete structures is essential to check for any damage or defects that may require repair. Footing Type: Concrete Slab Roofing Type: Concrete Roof Tiles INSPECTION & REPORT DETAILS Inspection Date: Saturday 10th September 2016 Inspection Time: 12:00pm Weather Conditions: Overcast Stage of Works: Pre Slab Pour Date of this Report: Saturday 10th September 2016 INSPECTION NOTES At the time of this inspection, we note the following; 1. Stay Informed. within tolerance). Types and strengths of materials to be used in the f o rm w o rk 2. Brief description of the building and other structures on the property: Dwelling Type: Dwelling Additions: Dwelling Configuration: Domestic Attached Garage Two Storey Piers: Concrete Main Construction: … Checklist for Suspended Slab No. 3 Beam to beam measurements shall be checked as per architectural drawings. Start a … Immediately after stripping the formwork, all concrete members casted are carefully inspected and any defective work or small defects either removed or made good before the concrete has thoroughly hardened. Date: Proposed Pour Date: Type of Structure: Type/Strength of Concrete: Concrete Quantity: Yes 1.0 Excavation 1.1 Is the excavation correct in size? Piping must be properly protected from impact and corrosion. The most secure digital platform to get legally binding, electronically signed documents in just a few seconds. This concrete quality control checklist can serve as your quality control checklist, and you can use and edit it to suit your own projects and company. Fill out, securely sign, print or email your concrete checklist form instantly with SignNow. Inspection is the observation of the processes and products of manufacture or construction for the purpose of ensuring the presence of desired qualities. The CFMEU represents over 30,000 construction … in this Video Lecture you are able to Learn checklist for beam slab and column before staring concrete. Walls c. Structural slabs d. Slab-on-grade interior e. Slab … For example, use one set of blanks during design and the second set during construction inspection. REPORT# FABRICATOR / LOCATION MOOT ID . 00 000 - Sample ~ Slab Pre Pour New Home Inspections Pty Ltd (ACN 149 410 533) Page 2 of 7 Client Brief We have been requested by the client to attend their property and carry out a inspection on the quality pre-pour slab preparation works for the in situ reinforced concrete member detailed in their architectural and engineering Drain lines must be filled with a 10' column of water. 2. 4 Individual level & diagonall of each slab bay shall be checked. Aside from checking the required concrete cover and the number of steel reinforcement and the stirrups/link … QAQC CHECKLIST - Suspended Slab and Beam - Free download as Word Doc (.doc), PDF File (.pdf), Text File (.txt) or read online for free. The checklist could be used many ways. Construction site is safe for inspection and safe to transverse. Whether you are a building official, building inspector, or a real estate buyer's agent performing a building inspection, this visual inspection form template will make the concrete foundation and slab inspection process incredibly easy. Customise checklist fields with easy drag-and-drop functionality. According to researchers, the general lifespan of a concrete building lies in the average range of 75 to 100 years. The structural integrity of a new home is only as good as the base or concrete slab upon which it has been constructed. : Contract Specifications Clause: Location: Drawing Ref. ACI Manual of Concrete Inspection Reported by ACI Committee 311 ACI 311.1R-07 (ACI SP-2(07)) PREFACE This manual is intended to guide, assist, and instruct concrete inspectors and others engaged in concrete construction and testing, including field engineers, construction superintendents, supervisors, laboratory and field technicians, and workers. Sequence of construction and milestones dates a. The importance of base stage inspections or slab stage inspections. The formwork and steel reinforcement was in … Foundations b. To be completed by the QA inspector, combined with all other fabrication . “ Life expectancy “ is not just a term associated with a living, breathing being, but even with an immobile non-living element, like a building. 1.4 Is selected fill/blinding concrete in place? (CRC R319) Toilet facilities are on-site. This checklist serves as a chapter summary, helps review the completeness of construction drawings and specifications, and provides general guidance on project management. 5616 (10/20) CHECKLIST . (CPC 422.5) Animals are restrained. (P2603) Bearing points for columns and bearing walls should be clearly defined at inspection. INSPECTION … Inspection of post tensioned concrete: WHO and WHY? Pipe installed with rubber gasket joints with no spalling in gasket interface area 3. 1 Beam bottom’s line, level & width should be checked. Preliminary City of Austin | Electrical Slab Inspection Checklist – Residential Inspections 9/30/20 | Page 1 of 1 This checklist is provided as a reference tool, and it is not intended to be exhaustive of all possible requirements. UNDER SLAB INSPECTION CHECKLIST Slab inspections are required whenever any utility (plumbing, electrical or mechanical duct or ... gas) through foundation walls and through concrete. 1.2 Is the base correctly compacted? The plumbing and sewer service, and distribution lines and drains shall be left uncovered and ready for leak inspection.